PROOF OF WORK

From spec sheet
to ship date.

Four case studies. Real clients, real challenges, real measured results. Materials listed, outcomes documented.

// HOW A POLY EVOLUTION ENGAGEMENT RUNS
BRIEF DAY 1 AUDIT WK 1 SOURCE WK 2-4 TEST WK 4-6 SHIP 48H SLA
CASE-FILE-0[ 01 ] COMPOUNDING + CONSULTING
AUTOMOTIVE · UNDER-HOOD
Air Duct Bracket: PA66-GF30
to Modified PP Mineral Blend
THE CHALLENGE
A Tier 1 automotive supplier needed to reduce component weight on a heat-exposed underhood bracket by at least 15% without sacrificing UL RTI rating or losing the existing material certification. The original PA66-GF30 grade was over-specified for the thermal environment but had legacy qualification attached to it.
APPROACH
We audited the actual thermal exposure profile, determined the part temperature rarely exceeded 120°C sustained, and formulated a 30% mineral-filled PP compound with a high-flow PP/PE alloy base and HALS-stabilized antioxidant package. Three sample iterations over six weeks to validate shrinkage and fit.
FROM: PA66-GF30 TO: PP-MIN30 Custom Compound UL RTI Maintained
18%
WEIGHT REDUCTION
Achieved in final compound vs. PA66-GF30 baseline
$0
RECERTIFICATION COST
Existing UL file maintained through equivalent RTI path
6 WK
DEV TO FIRST SAMPLE
Three formulation iterations; one reformulation round
CASE-FILE-0[ 02 ] DISTRIBUTION + CONSULTING
CONSUMER GOODS · PACKAGING
FDA-Compliant Closure Resin Conversion:
PP to Food-Contact LLDPE
THE CHALLENGE
A squeeze-bottle closure manufacturer needed to convert a threaded cap from PP to LLDPE to match the flexibility requirements of a new packaging format. The switch required FDA 21 CFR compliance, a color match to three existing SKUs, and no change to the tooling geometry or injection cycle time.
APPROACH
We sourced three LLDPE candidates, ran rheology comparison testing to confirm processability at existing cycle time, and pre-colored each candidate to the target Pantone values. The client molded all three and selected based on organoleptic and drop-test performance. Resin spec locked and ordered to production volumes within ten weeks of project start.
FROM: Injection-Grade PP TO: FDA LLDPE + Custom Color 21 CFR §177.1520
100%
FDA COMPLIANCE
All three selected grades cleared 21 CFR food-contact review
3
COLOR MATCHES
All three SKU Pantone targets hit on first color iteration
10 WK
PROJECT TO PRODUCTION
Candidate evaluation through production order
CASE-FILE-0[ 03 ] CONSULTING
MEDICAL DEVICES · PACKAGING
Sterilizable Tray Resin Selection
for EtO and Gamma Compatibility
THE CHALLENGE
A medical device OEM needed a thermoformable tray resin that would survive both EtO and gamma sterilization cycles without discoloration, embrittlement, or dimensional change. Off-the-shelf options had failed post-gamma testing at their contract sterilizer. No internal polymer expertise to diagnose why.
APPROACH
We identified the root cause as inadequate antioxidant packaging in the existing resin - gamma irradiation was oxidizing the stabilizer system, causing yellow shift. Sourced a gamma-stabilized PETG with a radiation-resistant antioxidant blend, performed accelerated aging tests, and validated it through the client's contract sterilizer before final spec lock.
FROM: Standard PETG TO: Gamma-Stabilized PETG USP Class VI · ISO 11135
0
COLOR SHIFT POST-GAMMA
DeltaE <0.5 measured after 50 kGy gamma dose
2
CANDIDATES TESTED
Both cleared; client selected based on thermoform window
8 WK
ROOT CAUSE TO SPEC LOCK
Including accelerated aging validation at sterilizer
CASE-FILE-0[ 04 ] DISTRIBUTION
INDUSTRIAL · PIPE & PROFILE
Emergency Pipe-Grade HDPE Supply
During Primary Supplier Outage
THE CHALLENGE
A pipe extrusion manufacturer lost access to their primary PE100 HDPE supply due to a plant shutdown. They had a four-week backlog of pipe orders with no alternative source and no time to qualify a new primary supplier at their normal pace. Minimum order requirement at other distributors was a full railcar - too much committed capital for a bridge supply.
APPROACH
We sourced PE100-rated HDPE from two secondary inventory positions, provided COA documentation demonstrating compliance to ISO 4427 requirements, and shipped partial loads across four weeks to match their production schedule without excess inventory build. Zero minimum order allowed them to right-size each delivery.
PE100 HDPE ISO 4427 Compliant $0 Order Minimum
4 WK
UNINTERRUPTED SUPPLY
Zero production shutdowns during primary supplier outage
48H
FIRST SHIPMENT
First delivery confirmed within 48 hours of initial inquiry
$0
EXCESS INVENTORY COST
No railcar commitment required; weekly partial loads
Your challenge next.

We don't quote from a catalog for consulting work - we listen to the problem first. Tell us where you are and what's not working.

Start a Conversation →